Marcin Log - November 2011
Contents
11/29/11
11/28/11
- Moving Roof Boxes Onto Roof*
- Plans coming together
- Moving Roof Boxes Panorama*
- Brick City*
- Tarp removal to allow for bricks in `Brick City` to dry
- Lettin' it all dry out
- Lifetrac Upgrades*
- Power Cube Connection to Tractor*
- Connecting power lines from Power cube to valves
- 2 return lines
- Check valves to ensure multiple Power Cubes employed don't fight each other
- Fredrick Emmons Earth Burm biotecture
- Pushing roof sections onto workshop
- Monday morning workshop update
- Unloading plywood and framing
- One minute video of 4" brick pressing
- Lifetrac dismounting wheels
- Another minute of shaker
- Bobcat exploded?
- Aftermath of Bobcat explosion
- Reinforcing CEB compression chamber
- Reinforcing CEB compression chamber 2
- Brick pressing and roller setup
- Grate modification
- Brick mudding and laying
- Early days brick laying
- Soil Pulverizer overview
- Replacing solenoid driver board on CEB
- Moving Soil Pulverizer into shop
11/26/11
- Loader Mounted Cement Mixer Results*
- Modication needed
- Intro on Cement Mixer*
- Perfect Day for Pressing Bricks*
- Marcin and Floyd making the best use of bad weather
- Brick pressing under cover
- Loading soil without pulverizer
- Loading hopper straight from loader
- Shaker Function
- 1 minute of pressing
- 1 minute of pressing (2)
- Cement mixer in action
- Mixer lid closed
- Loading cement mixer
- Attaching mixer to Bobcat
- Another miute of pressing
- Shaker and Stacking
- Loading soil without pulverizer
- Shaker detail
- Shaking soil down CEB machine
- `nother minute of pressing
- First use of the workshop for modification of Lifetrac
- James Slade from Texas
- James Slade from Texas
11/25/11
- Floyd Details Workshop Alignment Methods*
- Techniques and tools to perfectly align workshop
- Level, chalk line and string line instructional
- Patterns to ensure level alignments
- Use of cripplers for beam and box installation
- Floyd Talks about Reject Lime Being Used to Press Bricks*
- Possible use for reject lime, to make blocks for weather-facing exterior perimeter foundations (cheaper)
- Floyd Describes Column Prototype*
- 2x2 foot hollow column prototype design to be filled in
- Current Construction Scene*
- Putting roof sections on the workshop
- Roof sections lean on roof
- John the Carpenter discusses progress and forecasts roof rafters up next week (weather providing)
- From pulverizer to brick
- Pulverizer munching soil
- From pulverizer to brick line
- 1600 Bricks pressed (4.5 bricks per minute consistently)
11/24/11
- Testing Report for Field Pulverizer*
- Modifications and issues from Field Pulverizer tests
- Safety recommendations from Marcin for safe Field Pulverizer use
- Workshop roof preparation construction
- Temporary post use
- Simultaneous action of CEB Presses
- Getting cement mixer up and running
- Brick City, repository or bricks for storage from elements
- Windrows of dug-up soil for brick pressing of 2,000-3,000 bricks
- Reject limestone soil use
- Leveling workshop frame questions
- Workshop skeleton panorama
- Strawbales and shop
11/23/11
- Roof Anchoring with Floyd*
- Floyd discusses anchoring the structures for the upcoming roof build
11/22/11
- Floyd Discussing Structural Stability*
- Floyd discusses bracing, support triangles and tying in preparation for Roof Boxes
- Workshop Status with Floyd Hagerman*
- Floyd discusses interim progress on workshop build and upcoming element builds
11/16/11
- CEB Construction Review and Problem Solving*
- Experienced builder Floyd Hagerman brings 20-years of experience to CEB project
- Addresses structural and moisture issues of troublesome wall on build
- Floyd discusses important details about weatherizing exposed walls and fixes for existing issues
11/14/11
11/13/11
- Moving lumber for roof boxes
- Moving lumber for roofs
- Preparing to build columns
- Reinforcing main compression chamber
11/13/11
- Yoonseo Gives Tutorial on Laying Bricks for the Columns
- Yoonseo explains the proper use of slurry, brick laying techniques and proper patterns
- Finishes with a Q&A where Yoonseo fields questions as to why brick patterns and proper technique are necessary
11/12/11
- Problem with Nov 12 Pressing
- Rain without sun left the soil wet, putting a damper on the scheduled pressing
- Bridging Issue
- Wet soil causing problems with bridging
- The painfully slow, yet effective, 'poking-it-with-a-stick' methodology keeps project on track but behind schedule
- Meeting of the CEB presses
- Powell machine arrives to the site
- Powell CEB Press creating different sized blocks
- Moving Powell machine while on site
- Visual of pressing machine at work
- Bricks finished being loaded onto pallets
- Forklift moving pallets of pressed bricks
11/11/11
- Prototype 1 Loader Mounted Cement
- Visual of Prototype 1 and its quick attach motor, Lifetrac standard, large internal paddles
- Additional visual
11/05/11
- Workshop Columns Assembly
- Column construction coming along nicely
- Words of Wisdom from Yoonseo
- A wonderfully eloquent soliloquy about what brought Yoonseo to the Factory Farm project
11/04/11
- Workshop Slab
- 2/3 of the slab is finished
- Description of the final details and pour to complete the concrete slab
- concrete slab joints cutting visual
- Release cut ergonomics