See blog post - http://blog.opensourceecology.org/2011/06/june-1-production-run-update/
Other documentation forthcoming.
Tasks Remaining
- Outstanding Parts
Wheel Mounting
- Drill 1-3/8" ends of shafts
- Drill 3/4" hole for wheel mounting shafts
- Cut wheel mounting gussets
- CNC Torch Table Wheel Mounting plates (12)
- CNC Torch Hydraulic motor interface plates (12)
- CNC Torch Hydraulic motor plates (12)
Tractor Balance of Frame
- Main lower hydraulic attachment plates (6 total)
- Main upper hydraulic attachment plates (6 total)
- Prepare valve mounting bar
- Torch holes for Loader bars
- Prepare loader bars
- Loader cross support hole drilling
Holepuncher
- Eyes for QA plates
- Eyes for cylinder attachments
- Main CEB frame holes
- Arm holes for CEB
- Hopper mount plate holes
- Loader arm cross support plates
QA Plates
- Specify QA mechanism
- Do quick attach mechanisms (6 total, 2 per tractor)
- Weld eyes to QA plates
CEB
- Cut remaining frame pieces
- Cut 3 more hopper sheets
- Prepare hopper edge sealing strips