Metallurgical Grade Silicon

From Open Source Ecology
Jump to navigation Jump to search
  • $2-3/kg in 2026 [1]
  • 100kW scale would be tough. Crucible and electrode costs are high, efficiency lower due to heat loss. 30-50% is electricity cost in production.