MicroHouse 4 Bathroom Requirement

From Open Source Ecology
Jump to: navigation, search

Requirement

  • Consists of 4 panels: floor with toilet plumbing, wall with outlets, shower stall module, water and power panel - one connection to hot and cold water - using a quick connect coupler
  • Utilizes water quick couplers to connect to household water system, potentially like these but truly quick-coupling.
  • Interface to entire bathroom is 2 walls (exterior + MicroHouse 1) and 2 walls to other locations
  • funcitonal walls are used: Sink wall, shower wall, toilet panel
  • Large fixtures are connected via threaded PVC couplers
  • Small fixtures (shower, sink) are connected via quick couplers
  • Extreme Manuafacturing modularity for parallel build - use water quick couplings and flexible hoses to make connections. Water circuit for domestic water comes as two connections: hot and cold water
  • Waste water couplers are used as well
  • Room comes with 4 connections: hot + cold water; waste water (1"), and shit.
  • Each module has:
  • Toilet - 2 - cold water+shit
  • Shower - 3 - hot + cold water + greywater
  • Sink - 3 - hot + cold + greywater

Execution