MicroHouse 4 Foundation - Module - Review
Hi Fred,
I am the founder of Open Source Ecology (OSE) - see my TED Talk - http://www.ted.com/talks/marcin_jakubowski.
I would like to inquire if you can review our simple foundation design for a small Compressed Earth Block structure - for structural integrity.
My calculations are here- https://docs.google.com/a/opensourceecology.org/presentation/d/1ZfrvXvAP8u8e7hrkF55pZuakQkJRRPKJPb4K3w-2HmA/edit#slide=id.g3761a0abd_31
We are doing a one story addition to the back of an existing structure, 53 feet long by 15 feet wide, with a 1' wide wall and 1' thick footer. I have gone through a deflection calculation for concrete, and concluded that a 6"x12" foundation with 5 sticks of 1/2" rebar would give us L/800 deflection and a safety factor of 10 for tensile strength.
I would like to get your feedback if this makes sense. If you cannot provide this service, then I would like to ask you if you could suggest another engineering consultant to verify the calculation for OSE.
I would like to explore whether this design could be verified as code-compliant in Missouri, zone 5. It is intended for use with a shallow insulated footer -
Thanks, Marcin
Hi Joe I am the founder of Open Source Ecology (OSE) - see my TED Talk - http://www.ted.com/talks/marcin_jakubowski. We are building a CEB home in our next workshop - and I wanted to ask for assistance in somebody doing foundation calculations - can you recommend somebody? My calculations are here- https://docs.google.com/a/opensourceecology.org/presentation/d/1ZfrvXvAP8u8e7hrkF55pZuakQkJRRPKJPb4K3w-2HmA/edit#slide=id.g3761a0abd_31 We are doing a one story home, with a 1' wide wall and 1' thick footer. I have gone through a deflection calculation for concrete, and concluded that a 6"x12" foundation with 5 sticks of 1/2" rebar would give us L/800 deflection and a safety factor of 10 for tensile strength.
I would like to explore whether this design could be verified as code-compliant in Missouri, zone 5. It is intended for use with a shallow insulated footer - https://docs.google.com/a/opensourceecology.org/presentation/d/1ZfrvXvAP8u8e7hrkF55pZuakQkJRRPKJPb4K3w-2HmA/edit#slide=id.g37370d77b_0173 I have a second question - do you know any CEB builders interested in creating a workshop with us, and running it - as an Extreme Build scanario where we swarm and build in a few days? We are aiming for 5 days for a simple 750 sf structure, finished to in/out finishing detail. Thanks, Marcin
References
Foundation calculations -
Knowledgeable about rammed earth, via D:
Fred Webster PhD, P.E. PO Box 4043 Menlo Park, CA 94026 Tel #: (650) 321-6939 Email: AdobeBrix@aol.com I'd call for new contacts and maybe search for a website.
You can call Joe Tibbets--editor of Earthbuilder Magazine who knows everybody who is anybody in this business: (505) 861-1255 Email: adobebuilder@juno.com