SEH in 5 Trailer Loads
Loads
- Foundation
- Floor 1 + subfloor + garage
- Floor 2 + roof + PV + House wrap
- Interior framing with MEP and Tubs + doors + exterior trim + siding
- Insulation + beadboard + flooring + interior trim
- Landscaping, waste, water, electrical connection.
Narrative
Get inverter and solar up as soon as possible so that we have power. For the 240V input, use a 240V feed from a small inverter or use small gen with 120-240 Transformer