Sara Build Certification
Procedure
Build - [1]
Document on your log as Your_Name Build Certification with total of 18 pictures and 14 times.
- Build frame. 3 detailed Finished Pictures showing the amount of epoxy used on inside bottom, inside sides, and inside top. Time.
- Build Y Left Axis twice. Finished Picture from the side opposite of the motor. Time.
- Build Y Right Axis twice. Finished Picture from the opposite side of the motor. Time.
- Build X axis. Finished picture from motor side. Time
- Build extruder assembly. Finished picture. Time.
- Build heated bed (PEI addition + twist white wire around red. Finished picture from both sides. Time.
- Build control panel. Finished picture from both sides. Time.
- Mount Y axes and Z axes. Finished Picture. Time.
- Mount the X axis. Finished picture. Time.
- Mount heated bed. Finished picture. Time.
- Mount extruder. Finished picture. Time.
- Do cable chain and all wire routing and tidying. (Plugs should be labeled already). Finished picture. Time.
- Mount spool holder and filament. Finished Picture. Time.
- Upload .ini file for this printer to your log. Insert SD card with test cube. Print sample Test Cube at 50%. Picture closeup of cube. Time.
Links
- Sara Kit - [2]
Notes
- Label the frame in the kit build, but don't label motors
- Silver sharpie [3] for labeling during kit build. Label just cables for x, y, z cables, and x and y endstops