Seed Eco-Home 3 Build Pictures and Video
Contents
Google Photos
https://photos.app.goo.gl/y267SyY6BE5tU8Qj9
Putting Away
Part Library
YouTube link - [1]
Day 2
DIY SIP concept works.
https://youtu.be/TIdnJ9rZHt8?t=82
You see that install and alignment takes no more than 5 minutes for each module, meaning that the install of the first floor walls should take 2 hours. If we have all the modules on the pad, and we use 4 teams starting at each corner, all the walls for Floor 1 should come up in 30 minutes. That is breakthrough.
You can see the rest of the wall module builds at https://www.youtube.com/watch?v=meMiiiAZDsg
Day 1 of Build
Foundation Pour.