Uploads by Cody Harrison
Jump to navigation
Jump to search
This special page shows all uploaded files.
Date | Name | Thumbnail | Size | Description | Versions |
---|---|---|---|---|---|
15:04, 11 October 2013 | Screen Shot 2013-10-09 at 6.28.28 PM.png (file) | ![]() |
43 KB | Screenshot of the backhoe pivot attached to the boom, stick and bucket. Hydraulic cylinders still need to be mounted to the pivot, and a cylinder needs to be added from the pivot to the boom. | 1 |
23:39, 7 October 2013 | Screen Shot 2013-10-07 at 2.59.11 PM.png (file) | ![]() |
112 KB | Example backhoe pivot from the following patent https://www.google.com/patents/EP2184404A2?cl=en&dq=backhoe+pivot&hl=en&sa=X&ei=FQhTUsiOJMq7qAHOtYGoAQ&ved=0CHcQ6wEwCQ | 3 |
18:01, 7 October 2013 | Screen Shot 2013-10-07 at 12.47.41 PM.png (file) | ![]() |
181 KB | Picture of the front end of Lenny Wayne's gearbox idea for left-right motion of the backhoe. Gearbox is hidden in this shot (mounted behind the hydraulic piston on the other side) | 1 |
17:52, 7 October 2013 | Screen Shot 2013-10-07 at 12.47.53 PM.png (file) | ![]() |
173 KB | Picture of side/back angle of Lenny Wayne's gearbox pivot. More here: http://opensourceecology.org/wiki/GrabCAD_Backhoe_Redesign_for_Fabrication | 1 |
17:43, 7 October 2013 | Backhoe laser cutout 2.jpg (file) | ![]() |
193 KB | Picture showing a mockup using the laser cutout of a hydraulic piston mounted at a wide angle (compared to what we believe is the industry standard of mounting the piston much closer in to the pivot) | 1 |
17:38, 7 October 2013 | Screen Shot 2013-10-07 at 12.12.40 PM.png (file) | ![]() |
306 KB | Cropped section of the photo found here: http://i01.i.aliimg.com/wsphoto/v0/378452605/-font-b-Mini-b-font-font-b-Backhoe-b-font-font-b-loader-b-font.jpg Showing the pivot | 1 |
18:46, 5 October 2013 | 2013-10-01 17.26.21-1.jpg (file) | ![]() |
834 KB | Lucas working on the 15th course of bricks out of 16 total courses. You can also see the the braces stabilizing the door and windows | 1 |
18:41, 5 October 2013 | 2013-10-01 12.30.38.jpg (file) | ![]() |
2.51 MB | CEB wall going up | 1 |
18:38, 5 October 2013 | 2013-09-30 14.38.34.jpg (file) | ![]() |
2.13 MB | Brick floor going in | 1 |
18:36, 5 October 2013 | 2013-09-28 17.17.43.jpg (file) | ![]() |
1.92 MB | Table full of electrical, plumbing, and fixture components. | 1 |
18:30, 5 October 2013 | 2013-09-28 17.17.18.jpg (file) | ![]() |
2.25 MB | Utility module in progress | 1 |
18:26, 5 October 2013 | 2013-09-27 13.13.05.jpg (file) | ![]() |
1.16 MB | Chris installing some of the plumbing | 1 |
18:21, 5 October 2013 | Spacer for measuring plumbing angles.jpg (file) | ![]() |
2.61 MB | Chris and I taped these two pieces of plywood together and attached them to the end of a 4 foot level in order to measure the fall of the blackwater plumbing PVC pipe. I believe it needs to be 4 inches per foot (need to double check that figure) | 1 |
18:39, 19 September 2013 | CodyharrisonDPVpic.jpeg (file) | ![]() |
78 KB | 1 | |
18:29, 19 September 2013 | CodyharrisonDPVpic.jpg (file) | ![]() |
78 KB | From left to right: Cody, Aaaron, Eugene | 1 |