Uploads by DavidIAm
Jump to navigation
Jump to search
This special page shows all uploaded files.
Date | Name | Thumbnail | Size | Description | Versions |
---|---|---|---|---|---|
19:04, 18 October 2011 | Hab Lab Coursework Retaining Wall.png (file) | ![]() |
84 KB | A foot thick wall coursing plan used for outer walls (inside and external facing) and the retaining wall. | 1 |
19:04, 18 October 2011 | Hab Lab Coursework Interior Walls.png (file) | ![]() |
126 KB | Stretcher bond walls for interior of hablab | 1 |
19:03, 18 October 2011 | Hab Lab Coursework Columns.png (file) | ![]() |
121 KB | Coursework plan for the CEB columns in the hablab | 1 |
05:37, 27 August 2011 | Build Column Rebar.png (file) | ![]() |
26 KB | 1 | |
05:35, 27 August 2011 | Set Up Delivery Slab Form.png (file) | ![]() |
28 KB | 1 | |
05:32, 27 August 2011 | Prepare Column Pad sites layout.png (file) | ![]() |
20 KB | For OSE Shop 2011 | 1 |
05:28, 27 August 2011 | Layout for digging column holes.png (file) | ![]() |
12 KB | For OSE Shop 2011 | 2 |
05:17, 27 August 2011 | Electrical 120 outlets Layout.png (file) | ![]() |
101 KB | 3 | |
05:02, 27 August 2011 | Rebar assembly for supply shed 21x21 slab.png (file) | ![]() |
71 KB | For OSE Shop 2011 | 1 |
05:01, 27 August 2011 | Rebar assembly for interior 16x16 slab.png (file) | ![]() |
54 KB | For OSE Shop 2011 | 1 |
05:01, 27 August 2011 | Rebar assembly for edge 16x21 slab.png (file) | ![]() |
68 KB | For OSE Shop 2011 | 1 |
05:01, 27 August 2011 | Rebar assembly for edge 16x16 slab.png (file) | ![]() |
69 KB | For OSE Shop 2011 | 1 |
05:00, 27 August 2011 | Rebar assembly for corner 16x21 slab.png (file) | ![]() |
69 KB | For OSE Shop 2011 | 1 |
05:00, 27 August 2011 | Rebar assembly for corner 16x16 slab.png (file) | ![]() |
58 KB | For OSE Shop 2011 | 1 |
04:59, 27 August 2011 | Rebar assembly for 21x21 corner slab.png (file) | ![]() |
64 KB | For OSE Shop 2011 | 1 |
02:29, 25 July 2011 | InterfaceAssembly.png (file) | ![]() |
79 KB | A proposal for the interface between columns and roof | 2 |
02:27, 25 July 2011 | OSE Wall Foundation Justification.png (file) | ![]() |
59 KB | Why I think the wall foundation is adequate | 1 |
01:45, 25 July 2011 | OSE Pillar Foundation Justification.png (file) | ![]() |
61 KB | Why I think the pillar foundation spreads enough weight onto the ground | 1 |
17:27, 18 July 2011 | S420if.jpg (file) | ![]() |
30 KB | Fanuc s420if robot operational envelope | 1 |
23:25, 25 June 2011 | Double circle section.jpg (file) | ![]() |
229 KB | David's Double Circle design, sectioned | 1 |
23:24, 25 June 2011 | Double Circle Outside.jpg (file) | ![]() |
164 KB | David's Double Circle design | 1 |
21:58, 25 June 2011 | Great Hall Section.jpg (file) | ![]() |
307 KB | A section of David's Great Hall design | 1 |
21:57, 25 June 2011 | Great Hall External.jpg (file) | ![]() |
325 KB | An external view of David's Great Hall design. | 1 |
01:23, 14 June 2011 | AmmoniaAbsorptionIcemaker.pdf (file) | ![]() |
347 KB | An article on the construction and theory of an ammonia Absorption icemaker that could be the basis for a freezer system. | 1 |
18:35, 7 June 2011 | Dogs Raw 13132.jpg (file) | ![]() |
1.16 MB | David Ihnen with his close companions, Akando the white and Banshee the sable. | 1 |