Uploads by Greg Buckland
Jump to navigation
Jump to search
This special page shows all uploaded files.
Date | Name | Thumbnail | Size | Description | Versions |
---|---|---|---|---|---|
20:23, 18 April 2015 | Output Arrow.svg (file) | ![]() |
38 KB | Output Arrow Icon | 1 |
20:23, 18 April 2015 | Input Arrow.svg (file) | ![]() |
38 KB | Input arrow icon | 1 |
20:22, 18 April 2015 | Role Allocation.svg (file) | ![]() |
45 KB | Role allocation icon | 1 |
16:07, 5 September 2014 | Vent takeoff.jpg (file) | ![]() |
28 KB | 6" square vent takeoff (similar to one we plan to use to ventilate the Lasersaur cutting chamber | 1 |
14:47, 29 August 2014 | Barrel Bolt Lock.skp (file) | ![]() |
109 KB | Same as previous file, but this one is Sketchup v8 | 2 |
14:32, 29 August 2014 | PCSF vert.skp (file) | ![]() |
21.83 MB | Same as previous, but this one is Sketchup v8 | 8 |
04:54, 29 August 2014 | TV stand.jpg (file) | ![]() |
220 KB | TV Stand built in 15 minutes by Greg Buckland (pictured), Ben Acohn, and Mathias Haingartner to allow HabLab TV to be taken outside for Microhouse 3.0 workshop presentation. | 1 |
04:52, 29 August 2014 | Workshop toilet3.jpg (file) | ![]() |
167 KB | Assembled Composting Toilet wall frames. Clamped together in workshop for dry fit before assembly on site | 1 |
04:51, 29 August 2014 | Workshop toilet2.jpg (file) | ![]() |
173 KB | 1 | |
04:51, 29 August 2014 | Workshop toilet1.jpg (file) | ![]() |
140 KB | 1 | |
21:17, 28 August 2014 | Composting Toilet Sketchup.png (file) | ![]() |
189 KB | Sketchup screenshot of composting toilet | 1 |
21:09, 28 August 2014 | Composting Toilet.skp (file) | ![]() |
2.53 MB | Mostly finalized sketchup of OSE's composting toilet, built August 2014 designed and built by Greg Buckland and Ellena Baum. | 1 |
08:21, 28 August 2014 | Midnight toilet3.jpg (file) | ![]() |
121 KB | Midnight assembly of composting toilet the night before the Microhouse workshop begins in earnest (taken 2014-08-07 ca. 11:30pm) | 1 |
08:21, 28 August 2014 | Midnight toilet2.jpg (file) | ![]() |
121 KB | Midnight assembly of composting toilet the night before the Microhouse workshop begins in earnest (taken 2014-08-07 ca. 11:30pm) | 1 |
08:20, 28 August 2014 | Midnight toilet1.jpg (file) | ![]() |
134 KB | Midnight assembly of composting toilet the night before the Microhouse workshop begins in earnest (taken 2014-08-07 ca. 11:30pm) | 1 |
08:06, 28 August 2014 | Toilet stair sideview.png (file) | ![]() |
115 KB | sideview of toilet sketchup model showing final stair and railing design | 1 |
07:58, 28 August 2014 | Showing off toilet small.jpg (file) | ![]() |
57 KB | Greg & Ellena showing off their creation | 1 |
07:57, 28 August 2014 | Outhouse complete small.jpg (file) | ![]() |
63 KB | Outhouse complete. Taken 2014-08-22 | 1 |
07:44, 28 August 2014 | Stair layout.png (file) | ![]() |
68 KB | Final stair stringer layout for composting toilet at Factor-e Farm | 1 |
07:16, 28 August 2014 | Barrel bolt.png (file) | ![]() |
58 KB | CAD snapshot of barrel bolt design for composting toilet | 1 |
07:15, 28 August 2014 | Draft PC expl.png (file) | ![]() |
215 KB | Unlabeled draft of exploded parts diagram for Structural Power Cube | 1 |
18:08, 18 August 2014 | MicroHouse3.skp (file) | ![]() |
15.54 MB | version "H" - updated carsiding to reflect loft window location change, added corrugated fill color to roofing, fixed a few small details in the soffits/facia | 4 |
14:45, 10 June 2014 | 3D print PLA Octopus.jpg (file) | ![]() |
198 KB | 3D Octopus printed in pink PLA plastic on Lulzbot TAZ1 at Factor-e Farm on 2014-06-09 | 1 |
06:28, 24 March 2014 | Greg Buckland OSE Portfolio.pdf (file) | ![]() |
2.4 MB | 1 | |
06:25, 24 March 2014 | Greg Buckland OSE Resume.pdf (file) | ![]() |
50 KB | Resume for Greg Buckland, DPV application | 1 |
04:26, 24 March 2014 | GregB headshot.jpg (file) | ![]() |
18 KB | Photo of Greg Buckland | 1 |