The Spark Build
Contents
Task Allocation
Preparation
- James, Jason, Tom - Power Cube
- Lucas, Leandra, Cory, Jordan - Explosions + Procedures + BOM
- Rob Farmer, Dante, Durante - take off old wheel units
- Marcin + Siku - Parts cost total
- Rob K, Katie - indisposed
Build
- List people and allocate tasks
- James, Jason, Tom - Power Cube
- Katie, Audrey, Emily, Nat - Abrasive Cutoff cutting + Dante & Durante -
- Marcin - quick attach plates
- Rob Farmer - bolts cutting
- Rob K+ Ian - shoppin + video
- Leandra - Mill to do hole in shafts
- Lucas - foot pedals
- Cory - valve mounting plates
- Jordan, Siku, DJ
Shop setup
- Parts run
Shopping List
- Lock washers
- Bandsaw blade
- Cutoff wheels- 14"
Tasks:
- Take off wheels
- Create cut lists
- Cutting materials
- Take off tracks
- Remove power cube
- Get blocks and stand tractor on blocks
- Shop signs
- Eyewash
- Generate cut list
- Generate procedures
- Build Power Cube
- Workshop inventory
- Tool prep
- Create cannibalization log
- Work instructions
- Graphical work instructions
Quality Control
- Download File:Cab and Loader Arms 12pm Jul 11.skp
- Loader forearm stability
- Force on arm lift cylinder mounting
- 9 degree cylinder angle means 9400 lbs lift force
- Foot pedal detail
- Valve 1 mounting plate detail
- Valve 2 mounting plate detail
- Foot pedal detail
- Pin tight with lever
- Seat mounting
- Wheel shaft procedure
- Loader down pressure
- Bolts clearing everywhere
- Bolting feasibility everywhere
- Build order correct for each moduleo
- Bottom cylinder mounting spacer means can't bolt the tubes together as is. Solution: bore out holes or move mounting 4" forward and wheel 4" forward and use a x8" plate for mounting
- 1/2" stickout on wheel me
- Narrower cab by 8" on each side to 32 inch door and 40" wide cab, to save 13' of tubing ($170)
Parts
First Choice
- 3 Spool, 25 gpm Motor Valve for Wheels, auxiliary implements, and turning - [1]. Needs Power Beyond Sleeve - [2]
- 25 GPM Joystick valve - [3]
- [4] hoses - [4]
- [2] hoses - [5]