Utility Wall Design-Build

From Open Source Ecology
Jump to: navigation, search

Updated procedures for marking and production after framing is done without MEP - [1]. This is the route in a low-skill environment when framing is done separately from MEP.

Note that the MEP-location magnets can be added in the module build phase in production. This is the preferred route in production, such that Quad Modules are produced as one step.