XM Component Test Procedure
Suggested Checklist
Should include rapid prototyping and working prototypes.
Rapid Prototype Level
- Build a rapid prototype first
- PerformCAE analysis performed for required strength, checks with XM Scaling Calculations
- Motion simulation performed
- Range of motion analysis via XM Rapid Prototyping
- Alignment procedure verified via XM Rapid Prototyping
Working Prototype Level
Work Product
- Test Results should be documented at XM Component Test Results page on wiki. Each of the above points should be documented as a basis for massive distributed collaboration.