The Spark Build: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
Line 6: Line 6:
Shopping List
Shopping List
*Lock washers
*Lock washers
*
*Bandsaw blade
Tasks:
Tasks:
*Take off wheels
*Take off wheels

Revision as of 15:36, 12 July 2013

Task Allocation

Main

  • List people and allocate tasks
  • Shop setup
  • Parts run

Shopping List

  • Lock washers
  • Bandsaw blade

Tasks:

  • Take off wheels
  • Cutting materials
  • Take off tracks
  • Remove power cube
  • Get blocks and stand tractor on blocks
  • Shop signs
  • Eyewash
  • Generate cut list
  • Generate procedures
  • Build Power Cube
  • Workshop inventory
  • Tool prep

Quality Control

LifeTrac4 (v5) snip2.PNG

  • Download File:Cab and Loader Arms 12pm Jul 11.skp
  • Loader forearm stability
  • Force on arm lift cylinder mounting
    • 9 degree cylinder angle means 9400 lbs lift force
  • Foot pedal detail
  • Valve 1 mounting plate detail
  • Valve 2 mounting plate detail
  • Foot pedal detail
    • Pin tight with lever
  • Seat mounting
  • Wheel shaft procedure
  • Loader down pressure
  • Bolts clearing everywhere
  • Bolting feasibility everywhere
  • Build order correct for each moduleo
  • Bottom cylinder mounting spacer means can't bolt the tubes together as is. Solution: bore out holes or move mounting 4" forward and wheel 4" forward and use a x8" plate for mounting
  • 1/2" stickout on wheel me
  • Narrower cab by 8" on each side to 32 inch door and 40" wide cab, to save 13' of tubing ($170)

Parts

First Choice

  • 3 Spool, 25 gpm Motor Valve for Wheels, auxiliary implements, and turning - [1]. Needs Power Beyond Sleeve - [2]
  • 25 GPM Joystick valve - [3]
  • [4] hoses - [4]
  • [2] hoses - [5]

Other Options

  • 25 GPM Joystick valve - [6]
  • 45 GPM auxiliary motor valve - [7] - note: motor auxiliary goes before the joystick loader valve.
    • Fittings - SAE 16 in,out,work - need 3 of [8] and 1 of [9]
  • 25 GPM auxiliary motor valve - [10]