The Spark Build: Difference between revisions
Jump to navigation
Jump to search
Line 12: | Line 12: | ||
#Nat | #Nat | ||
#Rob | #Rob | ||
# | #Dante | ||
# | #Durante | ||
#Leandra | #Leandra | ||
#Lucas | #Lucas | ||
Line 21: | Line 21: | ||
#Siku | #Siku | ||
#DJ | #DJ | ||
#Emily | |||
*Shop setup | *Shop setup | ||
*Parts run | *Parts run |
Revision as of 15:42, 12 July 2013
Task Allocation
Main
- List people and allocate tasks
- James
- Jason
- Tom
- James' Daughter
- Katie
- Audrey
- Gary
- Rob
- Nat
- Rob
- Dante
- Durante
- Leandra
- Lucas
- Jordan
- Cory
- Ian
- Siku
- DJ
- Emily
- Shop setup
- Parts run
Shopping List
- Lock washers
- Bandsaw blade
- Cutoff wheels- 14"
Tasks:
- Take off wheels
- Create cut lists
- Cutting materials
- Take off tracks
- Remove power cube
- Get blocks and stand tractor on blocks
- Shop signs
- Eyewash
- Generate cut list
- Generate procedures
- Build Power Cube
- Workshop inventory
- Tool prep
- Create cannibalization log
- Work instructions
- Graphical work instructions
Quality Control
- Download File:Cab and Loader Arms 12pm Jul 11.skp
- Loader forearm stability
- Force on arm lift cylinder mounting
- 9 degree cylinder angle means 9400 lbs lift force
- Foot pedal detail
- Valve 1 mounting plate detail
- Valve 2 mounting plate detail
- Foot pedal detail
- Pin tight with lever
- Seat mounting
- Wheel shaft procedure
- Loader down pressure
- Bolts clearing everywhere
- Bolting feasibility everywhere
- Build order correct for each moduleo
- Bottom cylinder mounting spacer means can't bolt the tubes together as is. Solution: bore out holes or move mounting 4" forward and wheel 4" forward and use a x8" plate for mounting
- 1/2" stickout on wheel me
- Narrower cab by 8" on each side to 32 inch door and 40" wide cab, to save 13' of tubing ($170)
Parts
First Choice
- 3 Spool, 25 gpm Motor Valve for Wheels, auxiliary implements, and turning - [1]. Needs Power Beyond Sleeve - [2]
- 25 GPM Joystick valve - [3]
- [4] hoses - [4]
- [2] hoses - [5]