The Spark Build: Difference between revisions
Jump to navigation
Jump to search
(→Build) |
|||
Line 11: | Line 11: | ||
#James, Jason, Tom - Power Cube | #James, Jason, Tom - Power Cube | ||
#Katie, Audrey, Emily, Nat - Abrasive Cutoff cutting | #Katie, Audrey, Emily, Nat - Abrasive Cutoff cutting | ||
#Marcin - quick attach plates | |||
#Rob Farmer - bolts cutting | #Rob Farmer - bolts cutting | ||
#Rob K+ Ian - shoppin + video | #Rob K+ Ian - shoppin + video | ||
Line 18: | Line 19: | ||
#Dante | #Dante | ||
#Durante | #Durante | ||
#Jordan | #Jordan | ||
#Cory | #Cory |
Revision as of 16:45, 12 July 2013
Task Allocation
Preparation
- James, Jason, Tom - Power Cube
- Lucas, Leandra, Cory, Jordan - Explosions + Procedures + BOM
- Rob Farmer, Dante, Durante - take off old wheel units
- Marcin + Siku - Parts cost total
- Rob K, Katie - indisposed
Build
- List people and allocate tasks
- James, Jason, Tom - Power Cube
- Katie, Audrey, Emily, Nat - Abrasive Cutoff cutting
- Marcin - quick attach plates
- Rob Farmer - bolts cutting
- Rob K+ Ian - shoppin + video
- Leandra - Mill to do hole in shafts
- Lucas - foot pedals
- Cory - valve mounting plates
- Dante
- Durante
- Jordan
- Cory
- Siku
- DJ
Shop setup
- Parts run
Shopping List
- Lock washers
- Bandsaw blade
- Cutoff wheels- 14"
Tasks:
- Take off wheels
- Create cut lists
- Cutting materials
- Take off tracks
- Remove power cube
- Get blocks and stand tractor on blocks
- Shop signs
- Eyewash
- Generate cut list
- Generate procedures
- Build Power Cube
- Workshop inventory
- Tool prep
- Create cannibalization log
- Work instructions
- Graphical work instructions
Quality Control
- Download File:Cab and Loader Arms 12pm Jul 11.skp
- Loader forearm stability
- Force on arm lift cylinder mounting
- 9 degree cylinder angle means 9400 lbs lift force
- Foot pedal detail
- Valve 1 mounting plate detail
- Valve 2 mounting plate detail
- Foot pedal detail
- Pin tight with lever
- Seat mounting
- Wheel shaft procedure
- Loader down pressure
- Bolts clearing everywhere
- Bolting feasibility everywhere
- Build order correct for each moduleo
- Bottom cylinder mounting spacer means can't bolt the tubes together as is. Solution: bore out holes or move mounting 4" forward and wheel 4" forward and use a x8" plate for mounting
- 1/2" stickout on wheel me
- Narrower cab by 8" on each side to 32 inch door and 40" wide cab, to save 13' of tubing ($170)
Parts
First Choice
- 3 Spool, 25 gpm Motor Valve for Wheels, auxiliary implements, and turning - [1]. Needs Power Beyond Sleeve - [2]
- 25 GPM Joystick valve - [3]
- [4] hoses - [4]
- [2] hoses - [5]