*What are the lessons learned for improving future builds? | *What are the lessons learned for improving future builds? | ||
*Was there any tool breakage? How could it have been avoided? | *Was there any tool breakage? How could it have been avoided? | ||
*Any other comments or pressing issues not covered in this assessment? | *Any other comments or pressing issues not covered in this assessment? |
Revision as of 03:05, 17 July 2013
Introduction
This is a template for documenting the lessons learned in a prototype build.
Assessment
Design Phase
- Describe the steps taken in the design process. What went well in the design phase? What could have been done better?
- Which steps in the design phase are easy to improve? Which are difficult to improve?
- Were there steps that should have been taken but were missing? Were there steps that were taken that should have been omitted? Explain.
- How did the design team feel about the design prior to the build and after the build?
- Describe what the ideal design process should look like.
Build Preparation
- Describe the steps taken to prepare for the build.
- Were you satisfied with the build preparation phase?
- What were the issues that were encountered? How were they resolved?
- Were the fabrication procedures satisfactory? What improvements could be made?
- Discuss how you would like the ideal fabrication procedures/drawings to look like.
- Describe how the ideal build preparation phase should look.
Build Phase
- What worked as planned regarding the build? What didn't work as planned?
- Describe the build sequence. Were you happy with the sequence? What could have been improved about the sequence?
- Were people utilized effectively throughout the build? How could they have been used more effectively?
- What quality control steps were taken throughout the build to assure build quality?
- What were the main build steps taken and what was their sequence?
- How many person hours should each of the above steps take? How many person hours did each step take in practice?
Quality Assessment and Performance Data
- Please perform a Quality Control Assessment.
- What corrective measures were taken to address quality control issues?
- Please document the Performance Data and Settings.
- Was the performance data satisfactory? What improvements should be made?
General
- Did you see any safety violations throughout the build?
- Were there any accidents? If so, how could they have been avoided?
- Describe your general level of satisfaction with the overall design/build and the resulting quality of the product.
- What are the lessons learned for improving future builds?
- Was there any tool breakage? How could it have been avoided?
- Any other comments or pressing issues not covered in this assessment?