*Discuss how you would like the ideal fabrication procedures/drawings to look like.
*Discuss how you would like the ideal fabrication procedures/drawings to look like.
*Describe how the ideal build preparation phase should look.
*Describe how the ideal build preparation phase should look.
*Discuss any inventory/supplies that were difficult to acquire, and how this could be facilitated.
*Were there missing parts that were not accounted for until they were needed in a certain build step?


==Build Phase==
==Build Phase==

Revision as of 03:42, 17 July 2013

Introduction

This is a template for documenting the lessons learned in a prototype build.

Design Phase

  • Describe the steps taken in the design process. What went well in the design phase? What could have been done better?
  • Were there steps that should have been taken but were missing? Were there steps that were taken that should have been omitted? Explain.
  • What review/quality assessment steps were taken throughout the design phase?
  • What lessons were learned regarding the design after the machine was built?
  • Describe what the ideal design process should look like.

Build Preparation

  • Describe the steps taken to prepare for the build.
  • Were you satisfied with the build preparation phase?
  • What were the issues that were encountered? How were they resolved?
  • Were the fabrication procedures satisfactory? What improvements could be made?
  • Discuss how you would like the ideal fabrication procedures/drawings to look like.
  • Describe how the ideal build preparation phase should look.
  • Discuss any inventory/supplies that were difficult to acquire, and how this could be facilitated.
  • Were there missing parts that were not accounted for until they were needed in a certain build step?

Build Phase

  • What worked as planned regarding the build? What didn't work as planned?
  • Describe the build sequence. Were you happy with the sequence? What could have been improved about the sequence?
  • Were people utilized effectively throughout the build? How could they have been used more effectively?
  • What quality control steps were taken throughout the build to assure build quality?
  • What were the main build steps taken and what was their sequence?
  • How many person hours should each of the above steps take? How many person hours did each step take in practice?
  • Quantify the consumables used throughout the build.

Quality Assessment and Performance Data

General

  • Did you see any safety violations throughout the build?
  • Were there any accidents? If so, how could they have been avoided?
  • Describe your general level of satisfaction with the overall design/build and the resulting quality of the product.
  • How was morale throughout the build?
  • Were any conflicts encountered throughout the design/build? How were these resolved?
  • What are the lessons learned for improving future builds?
  • Was there any tool breakage? How could it have been avoided?