Rob Beddingfield Log: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
No edit summary
Line 1: Line 1:
=TUE Aug 20, 2013=
*PLACED PARTS AND UPDATED THE MODEL FOR THE CONTINUOUS HINGES (HINGE LENGTH?)
=WED Aug 14, 2013=
=WED Aug 14, 2013=
*Finished inserting all cnc cut parts into the 3d model
*Finished inserting all cnc cut parts into the 3d model

Revision as of 06:25, 21 August 2013

TUE Aug 20, 2013

  • PLACED PARTS AND UPDATED THE MODEL FOR THE CONTINUOUS HINGES (HINGE LENGTH?)

WED Aug 14, 2013

  • Finished inserting all cnc cut parts into the 3d model
  • the existing compression chamber spacer does not seem to fit the mounting holes in the new cnc cut part.

File:CEB5 8-14-13.step

TUE Aug 13, 2013

  • 3D MODEL HOPPER ASSEMBLY

SAT Aug 10, 2013

File:CEB5.step

File:CEB5 drawer only.stp

File:CEB5 main frame only.stp

  • I'm not sure how to place items L-O15 and L-O16, see pic below as to my guess (yellow part), but it appears that these new parts are wider than the hopper supports,I'm sure I'm missing something.

Grate attachment.jpg



  • I'm not sure how parts L-O12 and L-O14 are placed to make the valve mount, maybe someone has a picture.

Otherpartsexample.jpg



  • I may have placed item L-O7 in the wrong place, see pic below (yellow part)

Cam clamp assy.jpg

Thu Aug 8, 2013

  • MADE 3D MODEL - CAM CLAMP ASSY
  • HAVE QUESTIONS ABOUT SENSOR CLAMPS
  • HAVE QUESTIONS ABOUT VALVE MOUNTING CLAMPS
  • NEED PICTURES OF ALL THREE INCLUDING CAM CLAMPS

TUE, 6 Aug

  • CEB V SOIL SHAKER 3D MODEL

MON, 5 Aug

  • CEB V Hopper Supports 3d model

SAT, 4 Aug

  • CEB V Arm assemblies 3d model

THU, 1 Aug

  • CEB V drawer

8-1-13 model.jpg

Wed, 30 Jul

  • CEB V frame - modified model for frame to reflect cnc cut parts.
  • Finished core assembly, drawer assembly next

Mon, 29 Jul

  • CEB V frame - modified model for frame to reflect cnc cut parts.
  • still need to assemble top flange assembly
  • Christmas_Gift_to_the_World

7-29-13 model.png