Surplus Center CEB 6 Partial Order: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(Created page with "Image:scceb6order.jpg")
 
No edit summary
Line 1: Line 1:
[[Image:scceb6order.jpg]]
[[Image:scceb6order.jpg]]
*Note- motor is 12 gpm continuous, so must be activated in parallel with other element or flow reduced
*motor is rated for 1800 psi, so pressure reducer must be used
*for 14 gpm - can use small cylinder motion to reduce flow, or just needle valve.
*for 28 gpm must have 3 solenoids going at once for shaker not to blow up
*cushion valve must be used in all cases
*to test cushion valve, observe pressure with pressure valve in manual mode
*next steps - use log splitter 2 stage pump for faster pressing

Revision as of 21:00, 28 April 2014

Scceb6order.jpg

  • Note- motor is 12 gpm continuous, so must be activated in parallel with other element or flow reduced
  • motor is rated for 1800 psi, so pressure reducer must be used
  • for 14 gpm - can use small cylinder motion to reduce flow, or just needle valve.
  • for 28 gpm must have 3 solenoids going at once for shaker not to blow up
  • cushion valve must be used in all cases
  • to test cushion valve, observe pressure with pressure valve in manual mode
  • next steps - use log splitter 2 stage pump for faster pressing