Surplus Center CEB 6 Partial Order: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
No edit summary
Line 2: Line 2:


*Note- motor is 12 gpm continuous, so must be activated in parallel with other element or flow reduced
*Note- motor is 12 gpm continuous, so must be activated in parallel with other element or flow reduced
:*Advanced flow reduction strategy - running other components in parallel
:*specific speeds and flows must be calibrated
*motor is rated for 1800 psi, so pressure reducer must be used
*motor is rated for 1800 psi, so pressure reducer must be used
*for 14 gpm - can use small cylinder motion to reduce flow, or just needle valve.
*for 14 gpm - can use small cylinder motion to reduce flow, or just needle valve.
*for 28 gpm must have 3 solenoids going at once for shaker not to blow up
*for 28 gpm must have 3 solenoids going at once for shaker not to blow up
*cushion valve must be used in all cases
*cushion valve must be used in all cases
:*p spike upon startup is an issue - needs to be tested - data collection - ie - pressure spike upon startup
*to test cushion valve, observe pressure with pressure valve in manual mode
*to test cushion valve, observe pressure with pressure valve in manual mode
*next steps - use log splitter 2 stage pump for faster pressing
*next steps - use log splitter 2 stage pump for faster pressing

Revision as of 21:07, 28 April 2014

Scceb6order.jpg

  • Note- motor is 12 gpm continuous, so must be activated in parallel with other element or flow reduced
  • Advanced flow reduction strategy - running other components in parallel
  • specific speeds and flows must be calibrated
  • motor is rated for 1800 psi, so pressure reducer must be used
  • for 14 gpm - can use small cylinder motion to reduce flow, or just needle valve.
  • for 28 gpm must have 3 solenoids going at once for shaker not to blow up
  • cushion valve must be used in all cases
  • p spike upon startup is an issue - needs to be tested - data collection - ie - pressure spike upon startup
  • to test cushion valve, observe pressure with pressure valve in manual mode
  • next steps - use log splitter 2 stage pump for faster pressing