MicroHouse 4 Utilities: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(e)
No edit summary
Line 13: Line 13:
*Underground water fittings are buried directly using corrosion-free fittings
*Underground water fittings are buried directly using corrosion-free fittings
*Leave provision for further extension of power grid from MicroHouse 3
*Leave provision for further extension of power grid from MicroHouse 3
<html></html>

Revision as of 16:44, 7 September 2014

Test-Driven Requirements

  • Water, septic tank, outdoor water hydrant, external 200A breaker and connection point for downstream 200A circuit, internet line
  • Documentation of all line paths and burial depths
  • Direct connection from street breaker panel to MicroHouse
  • Use 0000 aluminum cable for power
  • Attend to crossing points of internet, and attend to location of deeper water lines
  • 1" poly pipe for water
  • Power cable depth of 18"
  • Water line depth of 36"
  • Internet line depth of 18"
  • Water teed into Hablab, and teed off for MicroHouse 3
  • Underground water fittings are buried directly using corrosion-free fittings
  • Leave provision for further extension of power grid from MicroHouse 3