(Created page with "XM process revolves around leaning out the build so QC is prioritized early on, with as many QC steps frontloaded as possible. This allows steps of lesser importance to be car...") |
No edit summary |
||
Line 1: | Line 1: | ||
XM process revolves around leaning out the build so QC is prioritized early on, with as many QC steps frontloaded as possible. This allows steps of lesser importance to be carried out later in the process - allowing for fatigue only later in the day. | XM process revolves around leaning out the build so QC is prioritized early on, with as many QC steps frontloaded as possible. This allows steps of lesser importance to be carried out later in the process - allowing for fatigue only later in the day. | ||
Frontloading QC allows for full attention to be given to QC. | |||
Base steps: | |||
#Make frame of 4 2020s plus vertical angles. QC - long pieces front and back, short are superior of the front. |
Revision as of 05:17, 2 February 2016
XM process revolves around leaning out the build so QC is prioritized early on, with as many QC steps frontloaded as possible. This allows steps of lesser importance to be carried out later in the process - allowing for fatigue only later in the day.
Frontloading QC allows for full attention to be given to QC.
Base steps:
- Make frame of 4 2020s plus vertical angles. QC - long pieces front and back, short are superior of the front.