Jonathan Prusa i3 Build: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
(30 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
=Module 1= | |||
*[12] l brackets. | *[12] l brackets. | ||
*[24] set screws | *[24] set screws | ||
Line 9: | Line 10: | ||
*[2] shortest smooth rods | *[2] shortest smooth rods | ||
*[2] longest smooth rods | *[2] longest smooth rods | ||
*[1] | |||
#Larger washers | #Larger washers | ||
*[4] m4x14 bolts for rounded blocks | *[4] m4x14 bolts for rounded blocks | ||
*[6] m4x8 panhead bolts for idler and power supply | *[6] m4x8 panhead bolts for idler and power supply | ||
* | #5:54 to put in the set to set screws. Definitely needs to use technique. | ||
#Forgot to add the vertical l-brackets - was taken apart. | |||
#58 minutes to the idler. Exactly 2x over optimum time. | |||
=Module 2 - Extruder Carriage= | |||
*[7] bearings | |||
*[6] zip ties | |||
*[3] 3D printed pieces | |||
*[1] stepper motor | |||
*[1] pulley | |||
*[2] bearings | |||
*[1] m3x16 | |||
*[3] m3x20 | |||
*[3] lock washers | |||
#23:10 for time - :50 over world record | |||
=Module 3 - Z Motors= | |||
*[4] m4x8 panhead screws | |||
*[4] m4 t nuts | |||
*[2] steppers | |||
*[2] plexiglas faces | |||
*[2] couplers | |||
*[2] motor brackets | |||
*[8] m3x12 panhead screws | |||
*[8] m3 lock washers | |||
#9:20 - 30 seconds over the 8:50 olympic record. | |||
=Module 4 - Heat Bed= | |||
*[2] 16 gauge wires | |||
*[1] thermistor | |||
*[2] 7" red wire | |||
*[2] 7" black wire | |||
*[3] bearings | |||
*[3] bearing holders | |||
*[1] belt holder | |||
*[6] m3x20 pan head screws | |||
*[2] m3x12 pan head screws | |||
*[4] springs | |||
*[4] thumb screws | |||
*[4] m3x16 pan head screws | |||
*[8] m3 lock nuts | |||
#14:10 for electronic solder + wiring. | |||
#Ream out the plastic piece holes | |||
#43:22, or 29:12 if parallel cf 27:30. | |||
=Module 5 - Bed Motor= | |||
*[1] large motor | |||
*[1] pulley | |||
*[1] bracket | |||
*[2] m4x8 panhead srews | |||
*[4] m3x8 panhead | |||
*[4] lock washers | |||
#5:45 cf 3:45. OT on looking for screws. | |||
=Module 6 - End Stops= | |||
*[3] stop holders | |||
*[3] end stop electronics | |||
*[5] 3mm lock nuts | |||
*[2] 3x8 mm cap head screw | |||
*[3] 3x20 mm cap head screw | |||
#5 min of 3:30 world record | |||
=Module 7 - Extruder assy= | |||
#14:40 using soldering iron for heatshrink. Beat the world record of 16:20. | |||
=Module 8 - Power Supply= | |||
*19:39, beats the world record by one minute. | |||
=Module 9 - Controller= | |||
*[1] m4 t nut | |||
*[1] m4x8 cap head | |||
*[1] plexiglas mount | |||
*[1] controller board | |||
*[3] m3 lock washers | |||
*[3] m3x25 cap head screws | |||
#3: 4:00 cf 3:00 | |||
=Module 10 - Controller= | |||
*[4] stepper wires | |||
*[3] endstop wires | |||
#17:30 cf 12:40, with several minutes wasted on doing combined bundle instead of separate. | |||
#About 3:30 total. | |||
=Overall= | |||
*Heated bed bearings + rods - put them in before tightening bearing holders. | |||
*2:47, with 29 minutes on wiring. |
Latest revision as of 18:13, 18 March 2016
Module 1
- [12] l brackets.
- [24] set screws
- [14] m4 Tnuts
- [8] m5 Tnuts
- [6] small washers - note that they should be larger as they fall through.
- [4] square blocks
- [2] rounded blocks
- [6] corner brackets
- [2] shortest smooth rods
- [2] longest smooth rods
- [1]
- Larger washers
- [4] m4x14 bolts for rounded blocks
- [6] m4x8 panhead bolts for idler and power supply
- 5:54 to put in the set to set screws. Definitely needs to use technique.
- Forgot to add the vertical l-brackets - was taken apart.
- 58 minutes to the idler. Exactly 2x over optimum time.
Module 2 - Extruder Carriage
- [7] bearings
- [6] zip ties
- [3] 3D printed pieces
- [1] stepper motor
- [1] pulley
- [2] bearings
- [1] m3x16
- [3] m3x20
- [3] lock washers
- 23:10 for time - :50 over world record
Module 3 - Z Motors
- [4] m4x8 panhead screws
- [4] m4 t nuts
- [2] steppers
- [2] plexiglas faces
- [2] couplers
- [2] motor brackets
- [8] m3x12 panhead screws
- [8] m3 lock washers
- 9:20 - 30 seconds over the 8:50 olympic record.
Module 4 - Heat Bed
- [2] 16 gauge wires
- [1] thermistor
- [2] 7" red wire
- [2] 7" black wire
- [3] bearings
- [3] bearing holders
- [1] belt holder
- [6] m3x20 pan head screws
- [2] m3x12 pan head screws
- [4] springs
- [4] thumb screws
- [4] m3x16 pan head screws
- [8] m3 lock nuts
- 14:10 for electronic solder + wiring.
- Ream out the plastic piece holes
- 43:22, or 29:12 if parallel cf 27:30.
Module 5 - Bed Motor
- [1] large motor
- [1] pulley
- [1] bracket
- [2] m4x8 panhead srews
- [4] m3x8 panhead
- [4] lock washers
- 5:45 cf 3:45. OT on looking for screws.
Module 6 - End Stops
- [3] stop holders
- [3] end stop electronics
- [5] 3mm lock nuts
- [2] 3x8 mm cap head screw
- [3] 3x20 mm cap head screw
- 5 min of 3:30 world record
Module 7 - Extruder assy
- 14:40 using soldering iron for heatshrink. Beat the world record of 16:20.
Module 8 - Power Supply
- 19:39, beats the world record by one minute.
Module 9 - Controller
- [1] m4 t nut
- [1] m4x8 cap head
- [1] plexiglas mount
- [1] controller board
- [3] m3 lock washers
- [3] m3x25 cap head screws
- 3: 4:00 cf 3:00
Module 10 - Controller
- [4] stepper wires
- [3] endstop wires
- 17:30 cf 12:40, with several minutes wasted on doing combined bundle instead of separate.
- About 3:30 total.
Overall
- Heated bed bearings + rods - put them in before tightening bearing holders.
- 2:47, with 29 minutes on wiring.