Shelf Mounting Procedure: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(Created page with "#Mount the 6" piece first. #Mount the 8' plywood strip on back of the two 6" boards, on outside. The ID piece of about 4' long will be cut to size later.")
(No difference)

Revision as of 23:09, 12 April 2016

  1. Mount the 6" piece first.
  2. Mount the 8' plywood strip on back of the two 6" boards, on outside. The ID piece of about 4' long will be cut to size later.