Wed Apr 13 Notes: Difference between revisions
Jump to navigation
Jump to search
(Created page with "=Formal Design Process= *requirements *Logistical and site/Project specific constraints *Goals and Roadmap - outlines what is in the future assuming this is to be time-bound *...") |
No edit summary |
||
Line 1: | Line 1: | ||
=Formal Design Process= | =Formal Design Process= | ||
*Scope, functions accomplished | |||
*requirements | *requirements | ||
*Logistical and site/Project specific constraints | *Logistical and site/Project specific constraints | ||
Line 6: | Line 7: | ||
*SEBD and Integration | *SEBD and Integration | ||
*Tech tree - after outline of systems and integration, need to evaluate choices. Best to develop them in parallel. | *Tech tree - after outline of systems and integration, need to evaluate choices. Best to develop them in parallel. | ||
*Available components | *Available components and costs | ||
*Innovation + R&D Elements | |||
*ProductIzation | |||
*BOM | |||
*Build instructions | |||
*Build documentation | |||
*Data collection | |||
*Distributive Enterprise |
Revision as of 19:41, 13 April 2016
Formal Design Process
- Scope, functions accomplished
- requirements
- Logistical and site/Project specific constraints
- Goals and Roadmap - outlines what is in the future assuming this is to be time-bound
- module breakdown
- SEBD and Integration
- Tech tree - after outline of systems and integration, need to evaluate choices. Best to develop them in parallel.
- Available components and costs
- Innovation + R&D Elements
- ProductIzation
- BOM
- Build instructions
- Build documentation
- Data collection
- Distributive Enterprise