CEB Press v16.09: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
Line 1: Line 1:
=Files=
*1/2" steel library - [[File:CEB_half_relabel.dxf]]
=Visual Fabrication Diagrams=
=Visual Fabrication Diagrams=
==Frame Fabrication Diagram==
==Frame Fabrication Diagram==

Revision as of 06:40, 15 September 2016

Files

Visual Fabrication Diagrams

Frame Fabrication Diagram

File:Frame module.fcstd

Image is clickable:

Drawer Fabrication Diagram

Arms and Legs Fabrication Diagram

Hopper Fabrication Diagram

Hydraulics Fabrication Diagram

Controller Fabrication Diagram

Working Presentation

edit

Issue Tracker

  • There should be a CNC marking on the rib for the location of the soil block.
  • Front plate flange - does one have to be trimmed to make the hopper support fit on the ejection side?