Book - Time Budget: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(Created page with "Time allocations within 1-2 years. This is the time required to s *Solar Vehicle Construction Set- slow and fast cars and utility vehicles, including autonomous operation. *Tr...")
 
No edit summary
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
From [[Critical Path]]:
<html><img src="https://docs.google.com/drawings/d/e/2PACX-1vRJBsBSMZSjKLAJTGZVzV1RKeIzDiE3X4i5T6ApTTaNWYl2nRx8seA_ltIss4p8vEz6wKn1EJ2V5_B8/pub?w=900&amp;h=520"></html>
[https://docs.google.com/drawings/d/1Iw_HStjxyGVonzOyHMN-iUaNdSSO-vF54rEaamysGDE/edit edit]
Time allocations within 1-2 years. This is the time required to s
Time allocations within 1-2 years. This is the time required to s
*Solar Vehicle Construction Set- slow and fast cars and utility vehicles, including autonomous operation.
*Solar Vehicle Construction Set- slow and fast cars and utility vehicles, including autonomous operation.
Line 7: Line 13:
*Power Electronics Construction Set - 1 month
*Power Electronics Construction Set - 1 month
*Scale Models - 1 month
*Scale Models - 1 month
[[Category: Book]]

Latest revision as of 16:55, 9 February 2019

From Critical Path:

edit

Time allocations within 1-2 years. This is the time required to s

  • Solar Vehicle Construction Set- slow and fast cars and utility vehicles, including autonomous operation.
  • Tractor + Heavy Machine Construction Set - 1 month
  • Universal Axis Construction Set - 1 month
  • Housing Construction Set - 1 month
  • Aquaponic Greenhouse Construction Set- 2 weeks
  • Power Electronics Construction Set - 1 month
  • Scale Models - 1 month