From [[Critical Path]]: | |||
<html><img src="https://docs.google.com/drawings/d/e/2PACX-1vRJBsBSMZSjKLAJTGZVzV1RKeIzDiE3X4i5T6ApTTaNWYl2nRx8seA_ltIss4p8vEz6wKn1EJ2V5_B8/pub?w=900&h=520"></html> | |||
[https://docs.google.com/drawings/d/1Iw_HStjxyGVonzOyHMN-iUaNdSSO-vF54rEaamysGDE/edit edit] | |||
Time allocations within 1-2 years. This is the time required to s | Time allocations within 1-2 years. This is the time required to s |
Latest revision as of 16:55, 9 February 2019
From Critical Path:
Time allocations within 1-2 years. This is the time required to s
- Solar Vehicle Construction Set- slow and fast cars and utility vehicles, including autonomous operation.
- Tractor + Heavy Machine Construction Set - 1 month
- Universal Axis Construction Set - 1 month
- Housing Construction Set - 1 month
- Aquaponic Greenhouse Construction Set- 2 weeks
- Power Electronics Construction Set - 1 month
- Scale Models - 1 month