OSE Incentive Challenge Distribution: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(Created page with "We are looking at a basic, low cost production engineering for producing up to 30 or 60 drills per month per 3D printer if the single printer is running 24/7. *Goal is 12 hou...")
 
No edit summary
Line 4: Line 4:
*The challenge will be the logistics of supply at scale.  
*The challenge will be the logistics of supply at scale.  
*It appears that a big box store sells 250 drills per month.
*It appears that a big box store sells 250 drills per month.
=Links=
*[[OSE Incentive Challenge]]

Revision as of 19:01, 4 April 2019

We are looking at a basic, low cost production engineering for producing up to 30 or 60 drills per month per 3D printer if the single printer is running 24/7.

  • Goal is 12 hours of 3D printing per drill
  • I would like to see a production method where a person can build 12 drills in one day as a basic model of a one-room microfactory or garage.
  • The challenge will be the logistics of supply at scale.
  • It appears that a big box store sells 250 drills per month.

Links