House Cost Breakdown: Difference between revisions
Jump to navigation
Jump to search
(Created page with "=General= Generally, it's the 1/5ths rule: *20% land cost *20% materials *20% labor *20% financing *20% profit =House Build= *Foundation - 40% *Roof - 40% *Everything else -...") |
|||
Line 7: | Line 7: | ||
*20% profit | *20% profit | ||
=House Build= | =House Build (structure itself, not including site prep or site finishing= | ||
*Foundation - | |||
*Roof - | These are very rough estimates. See Links for details. | ||
*Everything else - | *Foundation - 20% (inludes utility rough-in) | ||
*Roof - 20% | |||
*Everything else - 60% | |||
=Links= | =Links= | ||
*House build cost breakdown - [https://www.24hplans.com/how-much-does-it-cost-build-new-house/] | *House build cost breakdown - [https://www.24hplans.com/how-much-does-it-cost-build-new-house/] |
Revision as of 17:26, 24 May 2019
General
Generally, it's the 1/5ths rule:
- 20% land cost
- 20% materials
- 20% labor
- 20% financing
- 20% profit
House Build (structure itself, not including site prep or site finishing
These are very rough estimates. See Links for details.
- Foundation - 20% (inludes utility rough-in)
- Roof - 20%
- Everything else - 60%
Links
- House build cost breakdown - [1]