GVCS 50/2/2: Difference between revisions
< GVCS 50
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
This is the log of an evolving strategic development plan for GVCS 50/2/2 - the goal of completing the [[GVCS]] in 2 years within a $2M budget. First, look at the [[GVCS 50]] - the 50 tools of the Global Village Construction Set ([[GVCS]]). *See [[GVCS Tools Status]] for development status by prototype (1-3) and by 31 steps for completing each prototype. | |||
This is the log of an evolving strategic development plan for GVCS 50/2/2 - the goal of completing the [[GVCS]] in 2 years within a $2M budget. | |||
=Proposed Timeline= | =Proposed Timeline= | ||
*Kickstarter campaign for the [[Open Source Microfactory]]- April 14 | *Kickstarter campaign for the [[Open Source Microfactory]]- April 14, 2011 | ||
**Expected deliverables: $100k of funding by June 1 | **Expected deliverables: $100k of funding by June 1 | ||
*Full Product Releases: Tractor, Pulverizer, and second prototype of Torch Table, by June 1, see [[Product Ecologies]] | *Full Product Releases: Tractor, Pulverizer, and second prototype of Torch Table, by June 1, see [[Product Ecologies]] | ||
* | * | ||
*Prioritized order of development: | *Prioritized order of development: | ||
Line 21: | Line 18: | ||
**Solar Concentrator - an advanced system integrating tracking, precision fabrication, and steam engine components | **Solar Concentrator - an advanced system integrating tracking, precision fabrication, and steam engine components | ||
**[[Extraction of Aluminum from Clay]] | **[[Extraction of Aluminum from Clay]] | ||
*Current Budgets | |||
[[Category:GVCS 50/2/2]] | [[Category:GVCS 50/2/2]] |
Revision as of 06:46, 29 March 2011
This is the log of an evolving strategic development plan for GVCS 50/2/2 - the goal of completing the GVCS in 2 years within a $2M budget. First, look at the GVCS 50 - the 50 tools of the Global Village Construction Set (GVCS). *See GVCS Tools Status for development status by prototype (1-3) and by 31 steps for completing each prototype.
Proposed Timeline
- Kickstarter campaign for the Open Source Microfactory- April 14, 2011
- Expected deliverables: $100k of funding by June 1
- Full Product Releases: Tractor, Pulverizer, and second prototype of Torch Table, by June 1, see Product Ecologies
- Prioritized order of development:
Requirements
- There are 6 major project groups:
- Open Source Microfactory - all of the fabrication tools
- Open Source Tractor Infrastructure - mechanical infrastructure and implements
- Steam Engine Infrastructure - Steam Engine, Steam Generator, Gasifier Burner, Pelletizer
- Solar Concentrator - an advanced system integrating tracking, precision fabrication, and steam engine components
- Extraction of Aluminum from Clay
- Current Budgets