How to prevent bottlenecks - and allow a novice team to produce advanced design?
- We start with a Basic Diagram.
 - We move on to Detailed Diagram outlining critical design features
 - We include calculations
 - We take it to CAD right away - cad up a design - and print a smaller scale item
 - A tech lead provides design rationales and explanations - at the most granular level
 - We outline Critical Challenges:
- Pulley desing
 - Frame mounting detail
 - Motor piece Minimum Detail
 - Idler piece MVP
 - Carriage piece MVP
 - Coupling of motor to idler
 - Coupling of motor to pulley
 - 2-sided drive
 - Scaling TB6600 to 2-4 motors by simple division from RAMPS - rapid prototype
 - Carriage full scale motion prototyping
 - Shaft preparation
 - Bushing preparation
 - 3D Printed acetal bushings