==2013 Grid Connection== | |||
*Summary: installed 400A service; can upgrade to 800A transformer at pole at relatively low cost - from [[Audrey_Log/May_2013#Mon_May_13.2C_2013]] | |||
=2013 Water + DSL= | =2013 Water + DSL= |
Revision as of 05:26, 13 April 2020
2019
Power
Connecting Faculty House and Seed Eco-Home to 200A and 100A service.
Internet
Notes:
- DSL internet from Centurytel has been discontinued as of late 2018 due to its top speed of only 4 Mbps
Install
Try 1 - after which we got a larger ride-on trencher.
2014 Grid, Water, Internet
Microhouse 4 Utilities Extension:
2013 Grid Connection
- Summary: installed 400A service; can upgrade to 800A transformer at pole at relatively low cost - from Audrey_Log/May_2013#Mon_May_13.2C_2013
2013 Water + DSL
Notes:
- Right side power line is not in use. It was installed from the huts to the old workshop initially, but was never used as the old workshop was off-grid on solar + Power Cubes in the early days. Since then the line was forgotten, and it may have been upearthed when the parking lot to the east of the new workshop was built.
- Water line going east is usable. It has never been put into service as of 2019, but should be for an RV campsite along with 200A service for RVs.
Links
- Grid Connection Costs - 2019
- Grid connection 2013 - OSE Grid Backup / Returning Power to the Grid Planning Log