Conceptual Design: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
Line 19: Line 19:
'''In the limit of a concept being filled in with technical details - we have a Technical Design.'''
'''In the limit of a concept being filled in with technical details - we have a Technical Design.'''


Jose Urra Sez: When I work I differentiate requirements from specifications. A design concept and its unfolding development is an attempt to specify the way in which requirements are met. Requirements can be stated without knowing in detail (specifically) how something is going to be achieved, they can be a set of goals or wishes that need to be verified. A concept is a model of a problem-solution unity more or less specified, or partially specified.Developing a concept thus, is the process of verifying the feasibility of the design concept. The rationale behind checking requirements is different from specifications, requirements need of validation, in the sense that you check to some extent if is needed, not if is feasible in detail. Validation/Verification of a Concept, when a concept is good enough is because there is a minimum check of validation(is needed, desirability), and verification (feasibility)
Jose Urra sez: When I work I differentiate requirements from specifications. A design concept and its unfolding development is an attempt to specify the way in which requirements are met. Requirements can be stated without knowing in detail (specifically) how something is going to be achieved, they can be a set of goals or wishes that need to be verified. A concept is a model of a problem-solution unity more or less specified, or partially specified. Developing a concept thus, is the process of verifying the feasibility of the design concept. The rationale behind checking requirements is different from specifications. Requirements need validation - insofar as to check that a given requirement is needed, not if it is feasible in detail. Validation of a Concept detail is used when a concept is refined enough - as a minimum check to determine if a design detail is needed. Verification of a concept is the determination of its feasibility - such as by doing calculations.


=Links=
=Links=

Revision as of 20:36, 16 September 2020

Protocol

HintLightbulb.png Hint: A concept should be in the form of a cloud, collaboratively editable document such as a google doc which allows various parts of a design to be detailed.

  1. To write a concept, start a google doc based on the Google Slides Template - click edit below the template to get to the viewable document, and make a copy of the document
  2. Include Design Rationale information for as many aspects of the design as possible. The Design Rationale should frequently refer to OSE Specifications as the basis.
  3. Name that document Machine_Name_Concept. See Taxonomy for information on naming projects.
  4. Embed in wiki, in a page named Machine_Name_Concept. If there is a naming conflict, add some more words to your title, such as Machine_Name_Version#_Concept.


About

The Design Concept is the first step of implementing the machine Requirement into an actual design.

The distinction between Requirement and Concept may be blurred - as a Requirement may be so detailed that it specifies actual technology/design choices.

In the limit of a fully-detailed Requirement - we have a concept.

In the limit of a concept being filled in with technical details - we have a Technical Design.

Jose Urra sez: When I work I differentiate requirements from specifications. A design concept and its unfolding development is an attempt to specify the way in which requirements are met. Requirements can be stated without knowing in detail (specifically) how something is going to be achieved, they can be a set of goals or wishes that need to be verified. A concept is a model of a problem-solution unity more or less specified, or partially specified. Developing a concept thus, is the process of verifying the feasibility of the design concept. The rationale behind checking requirements is different from specifications. Requirements need validation - insofar as to check that a given requirement is needed, not if it is feasible in detail. Validation of a Concept detail is used when a concept is refined enough - as a minimum check to determine if a design detail is needed. Verification of a concept is the determination of its feasibility - such as by doing calculations.

Links