Building Permits: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
Line 1: Line 1:
=About=
=About=
If you are building or armchair building, you can get an owner-builder permit.
If you are building or armchair building, you can get an owner-builder permit. [https://www.homeadvisor.com/cost/architects-and-engineers/get-a-building-permit/#:~:text=After%20submitting%20your%20application%2C%20it,to%20four%20weeks%20for%20approval.]


=Cost=
=Cost=

Revision as of 16:38, 22 October 2020

About

If you are building or armchair building, you can get an owner-builder permit. [1]

Cost

Building permit costs range from $100 on the low end to the $3000 range.

http://www.homeadvisor.com/cost/architects-and-engineers/get-a-building-permit/

Procedure

  • Get plans approved.
  • Build. You call up to invite the inspector on site. [2]
  • Utility release - after final inspection, when you are allowed to connect utilities.

Time

  • Ex. 4 weeks to approve plans - [3]
  • Inspection record card shows all the inspections required - [4]