Building Permits: Difference between revisions
Jump to navigation
Jump to search
(→About) |
(→Time) |
||
Line 14: | Line 14: | ||
=Time= | =Time= | ||
*Same day to 12 weeks - [https://www.buildzoom.com/answers/t/how-long-should-i-expect-to-wait-for-the-building-permit-process/737/2] | |||
*Ex. 4 weeks to approve plans - [http://www.slocity.org/home/showdocument?id=3878] | *Ex. 4 weeks to approve plans - [http://www.slocity.org/home/showdocument?id=3878] | ||
*Inspection record card shows all the inspections required - [http://www.slocity.org/home/showdocument?id=3878] | *Inspection record card shows all the inspections required - [http://www.slocity.org/home/showdocument?id=3878] |
Revision as of 16:40, 22 October 2020
About
If you are building or armchair building, you can get an owner-builder permit. [1]
Cost
Building permit costs range from $100 on the low end to the $3000 range.
http://www.homeadvisor.com/cost/architects-and-engineers/get-a-building-permit/
Procedure
- Get plans approved.
- Build. You call up to invite the inspector on site. [2]
- Utility release - after final inspection, when you are allowed to connect utilities.