Ironworker 3: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
Line 23: Line 23:


2.5 hours to assemble, up to the midway point of operating machine.
2.5 hours to assemble, up to the midway point of operating machine.
<html><iframe width="560" height="315" src="https://www.youtube.com/embed/wtFoct8DT8w" frameborder="0" allow="accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture" allowfullscreen></iframe></html>


=Links=
=Links=
*[[Ironworker Genealogy]]
*[[Ironworker Genealogy]]

Revision as of 23:18, 19 November 2020


Ironworker 3
   Home  |  Research & Development  |  Bill of Materials  |  Manufacturing Instructions  |  User's Manual  |  User Reviews   
Error creating thumbnail: File missing

The is the main page for version 3 of the Ironworker. See that page for general info and how it fits into the GVCS.

Status

As of Oct 2013, we're finishing version 3. See the Research and development link above.

As of Feb 2020 - this is the existing documentation - https://www.youtube.com/user/marcinose/search?view_as=subscriber&query=ironworker

Build - 2013

Getting the Blade Gap Correct

Realtime Documentation Workflow - Proof of Concept

5 Hour Assembly Time Total 'From Kit'

2.5 hours to assemble, up to the midway point of operating machine.

Links