D3D Pro v20.07 Cost Structure: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(Created page with "=Time For Kit Prep= *4 sets of frames, axes, and heat beds - cut, welded, ground, but not painted - in 3:30 hours for 4 kits. *Kit prep - controller test, part picking, all ot...")
 
No edit summary
 
Line 3: Line 3:
*Kit prep - controller test, part picking, all other cutting, packing, boxing, labeling - 3:45 for 1 kit
*Kit prep - controller test, part picking, all other cutting, packing, boxing, labeling - 3:45 for 1 kit
*Learnings - kit prep included making plug wires. All else can be streamlined significantly if all parts are laid out on a long, linear shelf so visually, I don't work from a part sheet - but all part requirements are numbered by each box. It is visual instructions that come right with the part box - part of visual workplace strategy.
*Learnings - kit prep included making plug wires. All else can be streamlined significantly if all parts are laid out on a long, linear shelf so visually, I don't work from a part sheet - but all part requirements are numbered by each box. It is visual instructions that come right with the part box - part of visual workplace strategy.
=Links=
*[[D3D Pro v20.07]]

Latest revision as of 16:37, 4 March 2021

Time For Kit Prep

  • 4 sets of frames, axes, and heat beds - cut, welded, ground, but not painted - in 3:30 hours for 4 kits.
  • Kit prep - controller test, part picking, all other cutting, packing, boxing, labeling - 3:45 for 1 kit
  • Learnings - kit prep included making plug wires. All else can be streamlined significantly if all parts are laid out on a long, linear shelf so visually, I don't work from a part sheet - but all part requirements are numbered by each box. It is visual instructions that come right with the part box - part of visual workplace strategy.

Links