$37.50: Difference between revisions
Jump to navigation
Jump to search
(Created page with "Skills required: *'''Design''' - ability to take full CAD model and view it, extract dimensions, and generate cross sections for build details. *'''Foundation''' - grading usi...") |
No edit summary |
||
Line 2: | Line 2: | ||
*'''Design''' - ability to take full CAD model and view it, extract dimensions, and generate cross sections for build details. | *'''Design''' - ability to take full CAD model and view it, extract dimensions, and generate cross sections for build details. | ||
*'''Foundation''' - grading using a bobcat, backhoe. Laser level and triangulation for corners. Ins and outs of form making, form assembly, rebar, vapor barrier, and shallow insulated footer. | *'''Foundation''' - grading using a bobcat, backhoe. Laser level and triangulation for corners. Ins and outs of form making, form assembly, rebar, vapor barrier, and shallow insulated footer. | ||
*'''Plumbing''' - understanding the design and building rough plumbing, and pressure testing for | *'''Plumbing''' - understanding the design and building rough plumbing, and pressure testing for 5 psi for 15 minutes. | ||
*'''Concrete Pour''' - ordering concrete, calculating concrete volume. Screeing, troweling | *'''Concrete Pour''' - ordering concrete, calculating concrete volume. Screeing, magnesium float, hand troweling, power trowel, watering, and protecting. | ||
*'''Concrete Polishing''' - using polishing buffers, going from 50-3000 grit for a shiny floor, including concrete densifier. | |||
*'''Foundation to Wall Detail''' - waterproof, air proof details for junction from cement slab to walls | |||
*'''Walls''' - making pre-finished wall modules with included utilities and ability to assemble them and align them up to the top plate. | |||
*'''First Floor Ceiling''' - Installing joists for a second floor, with ceiling sheething | |||
*'''2nd Floor Finishing''' - sanded plywood, stained, varnished plank floor with acoustic underlayment. | |||
*'''2nd Story Walls''' - building at height, these are procedures for using scaffolding and installing the second floor walls. | |||
*'''Interior Walls''' - | |||
*'''Bathroom''' - installing water heater, vent fan, shower, toilet, and sink | |||
*'''Kitchen Cabinets''' - selecting and installing cabinets and furnishings for the kitchen | |||
*'''Laundry''' - installing the laundry closet, washer, dryer, vent, and powering them from an appropriate outlet | |||
*'''Electrical''' - preinstalling electrical in wall panels, finishing with externa applainces such as lights and fans, and installing the utility power meter and panel. | |||
*'''PV''' - installing an off-grid power system with transfer switch, not utility intertie. |
Revision as of 18:41, 2 May 2021
Skills required:
- Design - ability to take full CAD model and view it, extract dimensions, and generate cross sections for build details.
- Foundation - grading using a bobcat, backhoe. Laser level and triangulation for corners. Ins and outs of form making, form assembly, rebar, vapor barrier, and shallow insulated footer.
- Plumbing - understanding the design and building rough plumbing, and pressure testing for 5 psi for 15 minutes.
- Concrete Pour - ordering concrete, calculating concrete volume. Screeing, magnesium float, hand troweling, power trowel, watering, and protecting.
- Concrete Polishing - using polishing buffers, going from 50-3000 grit for a shiny floor, including concrete densifier.
- Foundation to Wall Detail - waterproof, air proof details for junction from cement slab to walls
- Walls - making pre-finished wall modules with included utilities and ability to assemble them and align them up to the top plate.
- First Floor Ceiling - Installing joists for a second floor, with ceiling sheething
- 2nd Floor Finishing - sanded plywood, stained, varnished plank floor with acoustic underlayment.
- 2nd Story Walls - building at height, these are procedures for using scaffolding and installing the second floor walls.
- Interior Walls -
- Bathroom - installing water heater, vent fan, shower, toilet, and sink
- Kitchen Cabinets - selecting and installing cabinets and furnishings for the kitchen
- Laundry - installing the laundry closet, washer, dryer, vent, and powering them from an appropriate outlet
- Electrical - preinstalling electrical in wall panels, finishing with externa applainces such as lights and fans, and installing the utility power meter and panel.
- PV - installing an off-grid power system with transfer switch, not utility intertie.