File:Seh2 wall 17.fcstd: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
(Blanked the page)
Line 1: Line 1:
=Notes=
 
*Catarina had door retrofittability at 39", but since door rough-in needs to be 38.25, this would not work. Thus, 39" framing was eliminated and door retrofit can be done by moving window jack studs outwards slightly.
*Build note: jack studs must be toenailed at top for easy removal if turning this into a door - otherwise screws must be cut off. Rest is ok, as it can be removed without cutting screws.

Revision as of 18:22, 11 June 2021

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeDimensionsUserComment
current21:12, 28 April 2022 (14 KB)Marcin (talk | contribs)Positionally correct, on top of sill plate. Founation is z=0. Top blocking full.
06:06, 12 August 2021 (15 KB)RootIaliel (talk | contribs)Simple copy of 06:04, 12 August 2021, positionally correct
06:04, 12 August 2021 (41 KB)RootIaliel (talk | contribs)Moved bottom blocking up 7/8", changed upper blocking to half 2x4
18:23, 11 June 2021 (40 KB)Marcin (talk | contribs)

The following 3 pages use this file: