Housewrap Installation: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(Created page with "*Tape up vertical seams, but do not tape horizontal seams as tape on horizontal creates a 'reverse lap' which can allow more water to get behind the house wrap [https://www.gr...")
 
No edit summary
Line 1: Line 1:
*Tape up vertical seams, but do not tape horizontal seams as tape on horizontal creates a 'reverse lap' which can allow more water to get behind the house wrap [https://www.greenbuildingadvisor.com/article/housewrap-tape-problems]
*Tape up vertical seams, but do not tape horizontal seams as tape on horizontal creates a 'reverse lap' which can allow more water to get behind the house wrap [https://www.greenbuildingadvisor.com/article/housewrap-tape-problems]
*This article says the contrary - to tape up both vertical and horizontal seams. [https://www.familyhandyman.com/list/building-and-house-wrap-installation-tips/]
*Use cap nails, not only staples [https://www.familyhandyman.com/list/building-and-house-wrap-installation-tips/]. This does not appear to apply to Seed Eco-Home pre-wrapped modules, where house wrap is never exposed to wind because the sheathing is installed at the [[Factor e]]. Pun intended.

Revision as of 23:26, 11 June 2021

  • Tape up vertical seams, but do not tape horizontal seams as tape on horizontal creates a 'reverse lap' which can allow more water to get behind the house wrap [1]
  • This article says the contrary - to tape up both vertical and horizontal seams. [2]
  • Use cap nails, not only staples [3]. This does not appear to apply to Seed Eco-Home pre-wrapped modules, where house wrap is never exposed to wind because the sheathing is installed at the Factor e. Pun intended.