(Created page with "*12 Cell from [[Solar Hydrogen Chronicles] produces 0.5 cu ft/hr for each cell, or 6 cu ft/hr. Power of 1 kW, and cost of $2300 for the electolyzer stack of 12 units.") |
No edit summary |
||
(4 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
*12 Cell from [[Solar Hydrogen Chronicles] produces 0.5 cu ft/hr for each cell, or 6 cu ft/hr. Power of 1 kW, and cost of $2300 for the electolyzer stack of 12 units. | *12 Cell from [[Solar Hydrogen Chronicles]] produces 0.5 cu ft/hr for each cell, or 6 cu ft/hr. Power of 1 kW, and cost of $2300 for the electolyzer stack of 12 units. | ||
*How does this compare to 5* 500 cc/min (which is about 1/3 kg/day according to [[Electrolyzer#Separating_Hydrogen_Generator]])? 2500 cc/min = 5.3 cu ft/hr. Comparable. | |||
*But the Spicer electrolyzer is much cheaper - at $2300 compared to $3100. | |||
*The Spicer electrolyzer is probably doable for $100/cell or 12 cells for stack above. | |||
*Thus, the $10k per 1 kg/day (36 cells) can be brought down to $3.6k per kg/day production rate at the small scale. | |||
*And, better at a larger scale. | |||
'''Thus, it is safe to say that $3.6k gets us to 1 kg hydrogen per day or 1 gge.''' | |||
If 1 gge is $3, then it takes 1000 days for payback time to be achieved. 3 year payback. That is pretty good, and should be pursued. | |||
'''The requirement is [[Lifetime Design]] on the electrolyzer - so the generation infrastructure can be maintained. |
Latest revision as of 09:23, 5 February 2022
- 12 Cell from Solar Hydrogen Chronicles produces 0.5 cu ft/hr for each cell, or 6 cu ft/hr. Power of 1 kW, and cost of $2300 for the electolyzer stack of 12 units.
- How does this compare to 5* 500 cc/min (which is about 1/3 kg/day according to Electrolyzer#Separating_Hydrogen_Generator)? 2500 cc/min = 5.3 cu ft/hr. Comparable.
- But the Spicer electrolyzer is much cheaper - at $2300 compared to $3100.
- The Spicer electrolyzer is probably doable for $100/cell or 12 cells for stack above.
- Thus, the $10k per 1 kg/day (36 cells) can be brought down to $3.6k per kg/day production rate at the small scale.
- And, better at a larger scale.
Thus, it is safe to say that $3.6k gets us to 1 kg hydrogen per day or 1 gge.
If 1 gge is $3, then it takes 1000 days for payback time to be achieved. 3 year payback. That is pretty good, and should be pursued.
The requirement is Lifetime Design on the electrolyzer - so the generation infrastructure can be maintained.