Foundation Plumbing Inspection: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
No edit summary
Line 5: Line 5:


Notes:
Notes:
*5 lb pressure on a 16 lb gauge
*5 lb pressure on a gauge with 0.1 PSI increments per IRC P2503.9 [https://codes.iccsafe.org/content/IRC2012P13/chapter-25-plumbing-administration]
 
=Sourcing=
*

Revision as of 07:02, 2 April 2022

  • There may be an inspection during the foundation phase.

Notes:

  • 5 lb pressure on a gauge with 0.1 PSI increments per IRC P2503.9 [1]

Sourcing