Foundation Plumbing Inspection: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
No edit summary
Line 8: Line 8:


=Sourcing=
=Sourcing=
*
*See spreadsheet for SEH 2 [https://docs.google.com/spreadsheets/d/1FxnNF6fQZvQr709IeK0sg1S1nU9LJ3nZyswvDzp7_Nw/edit#gid=1113944822]

Revision as of 07:16, 2 April 2022

  • There may be an inspection during the foundation phase.

Notes:

  • 5 lb pressure on a gauge with 0.1 PSI increments per IRC P2503.9 [1]

Sourcing

  • See spreadsheet for SEH 2 [2]