Notes:
Notes:
*5 lb pressure on a 16 lb gauge
*5 lb pressure on a gauge with 0.1 PSI increments per IRC P2503.9 [https://codes.iccsafe.org/content/IRC2012P13/chapter-25-plumbing-administration]
*Final drainpipe - is covered to crown, and if step on it, it is not bouncing. But when is this done for a slab - we must have plumbing prior to pour?
*3" pipe - 1/8" slope per foot.
*2" pipe - must have 1/4" per foot slope on showers.
 
=Sourcing=
*See spreadsheet for SEH 2 [https://docs.google.com/spreadsheets/d/1FxnNF6fQZvQr709IeK0sg1S1nU9LJ3nZyswvDzp7_Nw/edit#gid=1113944822]

Latest revision as of 07:21, 2 April 2022

  • There may be an inspection during the foundation phase.

Notes:

  • 5 lb pressure on a gauge with 0.1 PSI increments per IRC P2503.9 [1]
  • Final drainpipe - is covered to crown, and if step on it, it is not bouncing. But when is this done for a slab - we must have plumbing prior to pour?
  • 3" pipe - 1/8" slope per foot.
  • 2" pipe - must have 1/4" per foot slope on showers.