Line 7: Line 7:
*See cleanout requirements.
*See cleanout requirements.
*[[Ford Fitting]] for water supply line if supply line connection is inside the house.
*[[Ford Fitting]] for water supply line if supply line connection is inside the house.
*Water pressure test required
*125 Water pressure test required
*Vacuum breakers on hose outlets
*Vacuum breakers on hose outlets
*Supply water line fill is inspected prior to covering
*Supply water line fill is inspected prior to covering

Revision as of 07:41, 2 April 2022

Detailed Checklist

https://mybuildingpermit.com/sites/default/files/inline-files/IC_Residential_Plumbing-Rough-In_Final.pdf

Notes

  • DWV - 5 psi air or water. See that valve holds. 0.1 psi graded valve.
  • Each trap protected by vent
  • See cleanout requirements.
  • Ford Fitting for water supply line if supply line connection is inside the house.
  • 125 Water pressure test required
  • Vacuum breakers on hose outlets
  • Supply water line fill is inspected prior to covering
  • Approved grounding system for water supply line?
  • Tracer wire for water supply from meter to foundation

Sequencing

  • Water Heater - Since it is a fixture [1] - a water heater is installed in the finish phase [2]
  • Water heater is often installed at rough plumbing phase [3]

At Foundation Phase