Rough Plumbing Inspection Checklist: Difference between revisions
Jump to navigation
Jump to search
(→Notes) |
(→Notes) |
||
Line 7: | Line 7: | ||
*See cleanout requirements. | *See cleanout requirements. | ||
*[[Ford Fitting]] for water supply line if supply line connection is inside the house. | *[[Ford Fitting]] for water supply line if supply line connection is inside the house. | ||
*Water pressure test required | *125 Water pressure test required | ||
*Vacuum breakers on hose outlets | *Vacuum breakers on hose outlets | ||
*Supply water line fill is inspected prior to covering | *Supply water line fill is inspected prior to covering |
Revision as of 07:41, 2 April 2022
Detailed Checklist
Notes
- DWV - 5 psi air or water. See that valve holds. 0.1 psi graded valve.
- Each trap protected by vent
- See cleanout requirements.
- Ford Fitting for water supply line if supply line connection is inside the house.
- 125 Water pressure test required
- Vacuum breakers on hose outlets
- Supply water line fill is inspected prior to covering
- Approved grounding system for water supply line?
- Tracer wire for water supply from meter to foundation
Sequencing
- Water Heater - Since it is a fixture [1] - a water heater is installed in the finish phase [2]
- Water heater is often installed at rough plumbing phase [3]