Detailed Checklist

https://mybuildingpermit.com/sites/default/files/inline-files/IC_Residential_Plumbing-Rough-In_Final.pdf

Notes

  • DWV - 5 psi air or water. See that valve holds. 0.1 psi graded valve.
  • Each trap protected by vent
  • See cleanout requirements.
  • Ford Fitting for water supply line if supply line connection is inside the house.
  • 125 Water pressure test required
  • Vacuum breakers on hose outlets
  • Supply water line fill is inspected prior to covering
  • Approved grounding system for water supply line?
  • Tracer wire for water supply from meter to foundation
  • Toilet clearance 15" from sides and 12" from back
  • Nail plates for vent pipe - if you have sheathing above vents.
  • Tape for joints in vents must be UL 181 listed.
  • Exterior wall water lines must be freeze protected.

Sequencing

  • Water Heater - Since it is a fixture [1] - a water heater is installed in the finish phase [2]
  • Water heater is often installed at rough plumbing phase [3]

At Foundation Phase