Rough Plumbing Inspection Checklist: Difference between revisions
Jump to navigation
Jump to search
(→Videos) |
|||
Line 1: | Line 1: | ||
=Status of Completion= | |||
*Connection to water and sewer is made for the rough-in plumbing phase. [https://www.kulksplumbing.com/rough-in-plumbing-vs-finish-plumbing/#:~:text=During%20The%20Rough%20In%20Plumbing%20Phase%3A&text=Drain%20lines%20and%20water%20supply,a%20primary%20structure%20is%20completed.] | |||
=Detailed Checklist= | =Detailed Checklist= | ||
https://mybuildingpermit.com/sites/default/files/inline-files/IC_Residential_Plumbing-Rough-In_Final.pdf | https://mybuildingpermit.com/sites/default/files/inline-files/IC_Residential_Plumbing-Rough-In_Final.pdf |
Revision as of 19:25, 2 April 2022
Status of Completion
- Connection to water and sewer is made for the rough-in plumbing phase. [1]
Detailed Checklist
Videos
- Short overview, doesn't say much but gets you into the inspector mood - [2]
- Relatively comprehensive video, with tub-shower pre-plumbed so none of its drain detail is shown:
- Or, see how inefficient it gets for a larger house - 6000 sf of concrete after rough plumbing - 150 yards - like 18 trucks/ Shows stressing of foundation cables [3]. Including copper pipe water service.
- Waste and water pressure testing - plugging all holes - showing different plugs , [4].
- The washing machine box - trim cover at end is adjusted to thickness of sheathing [5]
- Good one which shows what the inspector actually does - but this is not rough plumbing - just house plumbing inspection for home valuation purposes - [6]
Notes
- DWV - 5 psi air or water. See that valve holds. 0.1 psi graded valve.
- How do you stop the bath tub overflow? Drain should close, but overflow
- Each trap protected by vent
- See cleanout requirements.
- Ford Fitting for water supply line if supply line connection is inside the house.
- 125 Water pressure test required
- Vacuum breakers on hose outlets
- Supply water line fill is inspected prior to covering
- Approved grounding system for water supply line?
- Tracer wire for water supply from meter to foundation
- Toilet clearance 15" from sides and 12" from back
- Nail plates for vent pipe - if you have sheathing above vents.
- Tape for joints in vents must be UL 181 listed. [7]
- Exterior wall water lines must be freeze protected. [8]
- Max 32" between PEX line supports. [9]. Attach so that water hammer does not end up making noise.
- Backflow preventer from street sewer.
- Tubs are level - so you simplify the trim work necessary around it [10]
- Toilet 12.5" from framing, or 12 from wall. [11]
- Caulk around toilet and bath?
- Functional water flow test - [12]
- 2 parts vinegar + 1 part baking soda as alt to Drano [13]
Tub
- If tub is preinstalled, how to close overflow? The over flow I capped off by making a plate to screw on and used a piece of mouse pad as a gasket. [14]
- If tub is on second floor, its overflow can be the high water mark, so there is no need to close it. This would not apply if testing with air.
- For rough-in, the easiest approach to tub in our case (it doesn't fit through doors, so must be pre-located. Pre-located does not mean it has to be pre-plumbed. So leave the drain kit off - just make sure it is possible to install it _after_ the trap is installed.
- Assumes that trap doesn't have to be in for rough plumbing - just rough drain for tub. [15]
Sequencing
- Water Heater - Since it is a fixture [16] - a water heater is installed in the finish phase [17]
- Water heater is often installed at rough plumbing phase [18]